In pictures: Camel Train |
![]() |
At the heart of the salt harvest, lifters use rough wooden poles to lever up slabs of salt which are then cut into blocks. Like the camel men, the lifters travel up to 150 miles from the Ethiopian Highlands to work in the salt fields. |
Click below for more images |
|||||||||||||||||
|
|
||||||||||||||||