In Pictures: Mostar's Old Bridge rebuilt
Keystone

Construction work on the 30-metre-long, 20-metre-high arch began in June 2002.

The keystone was put in place in August 2003.

The bridge will open to the public in 2004.

Click below for more images
1 2 3 4 5 6 7 8
NEXT