Skip to main content
BBC NEWS / SCOTLAND
Graphics VersionBBC Sport Home
News Front Page | Africa | Americas | Asia-Pacific | Europe | Middle East | South Asia | UK | Business | Health | Science & Environment | Technology | Entertainment | Also in the news | Have Your Say |
UK Contents:  England | Northern Ireland | Scotland | Wales | UK Politics | Education | Magazine

Monday, 21 August 2006, 14:44 GMT 15:44 UK

Wind turbine floated to deepwater

Turbine picture courtesy of Alan Ross The first of two of the world's biggest offshore wind turbines has arrived at the Beatrice Field in the Moray Firth.

The tower and its components were taken by barge from the former oil fabrication yard at Nigg, in Invergordon, on Sunday.

A Scottish-based consortium led by oil firm Talisman and Scottish and Southern Energy (SSE) will test the deepwater turbines in a £35m pilot.

If successful, a full 200-turbine wind farm will be built 12 miles offshore.

Talisman Energy Project Director, Allan MacAskill, spoke to BBC Scotland as work got under way to transfer the first turbine.

It weighs about 1,000 tonnes and - when one of its three 63 metre long blades is pointing straight up - towers 170 metres above sea level.

Renewable energy

Mr MacAskill said it was lifted on to a barge and sailed out of the Firth on its way to the Beatrice Field.

It reached its destination on Monday morning.

"When we get there we will lift it up, move it over, lower it down and put a fully assembled power turbine and blades in one lift, which will take about four or five hours," said Mr MacAskill.

Turbine in Cromarty Firth

When the transfer of both turbines is complete they will be tested in depths of about 45 metres.

It is hoped the site will be capable of generating one Gigawatt of electricity, enough renewable energy to power the city of Aberdeen.

European Energy Commissioner Andris Piebalgs inspected the turbines at Nigg in July.

Government funding was secured two years ago, with £3m from the Scottish Executive and £3m from the Department of Trade and Industry.

Nationalist MEP Alyn Smith, who last month visited the Beatrice offshore wind farm project, congratulated the project team on the work so far.

He added: "Once these turbines are operational I hope this wind farm project will prove its worth and pave the way for more offshore turbines in the Moray Firth and elsewhere.

"The power that can be generated by these turbines offers Scotland a real renewable future."

The construction of the turbines has involved contractors in Arnish, Western Isles; Evanton; Inverness and Methil.



E-mail this to a friend
Related to this story:
Offshore turbines go on display (18 Jul 06 |  Highlands and Islands )
Windfall for offshore turbine plan (26 Aug 04 |  Scotland )
Huge wind farm blows into action (24 Aug 04 |  Scotland )
Highland wind farm wins backing (18 Aug 04 |  Scotland )
Setback for test wind farm plan (21 Jun 04 |  Scotland )
Call to keep wind farms in check (12 Dec 03 |  Scotland )
Public backing for green power (24 Aug 03 |  Scotland )

RELATED INTERNET LINKS
Scottish Executive
Talisman
Scottish and Southern Energy
Beatrice project
Dti
Scottish Nationalist Party
The BBC is not responsible for the content of external internet sites



SEARCH BBC NEWS: 

News Front Page | Africa | Americas | Asia-Pacific | Europe | Middle East | South Asia | UK | Business | Health | Science & Environment | Technology | Entertainment | Also in the news | Have Your Say |
UK Contents:  England | Northern Ireland | Scotland | Wales | UK Politics | Education | Magazine

NewsWatch | Notes | Contact us | About BBC News | Profiles | History

^ Back to top | BBC Sport Home | BBC Homepage | Contact us | Help | ©