Skip to main content
BBC NEWS / SCIENCE/NATURE
Graphics VersionBBC Sport Home
News Front Page | Africa | Americas | Asia-Pacific | Europe | Middle East | South Asia | UK | Business | Health | Science & Environment | Technology | Entertainment | Also in the news | Have Your Say |
Wednesday, 6 September 2006, 22:10 GMT 23:10 UK

Further delay for space shuttle

Space Shuttle Atlantis (Image: Nasa/Kim Shiflett) Nasa has postponed the launch of the space shuttle Atlantis until at least Friday because of a technical problem with its onboard power supply.

Atlantis had been scheduled for a 1229 EDT (1629 GMT) lift-off on Wednesday from Florida's Kennedy Space Center.

Initially Nasa had hoped to reschedule the launch for Thursday.

Officials said the launch had been scrubbed because one of the three fuel cells providing electricity to the shuttle malfunctioned.

The earliest launch window will now be at 1140 EDT (1540GMT) on Friday.

"The launch rules say you need to have three good, operating fuel cells," said Nasa spokesman Bruce Buckingham. "We're going to see if it's something that's a real problem or whether it's something we can rectify."

Two previous launch attempts have been delayed because of a lightning strike and Tropical Storm Ernesto.

The problem was discovered shortly before an overnight meeting to decide whether to start pumping the shuttle's fuel tank with liquid hydrogen and oxygen.

When the fuel cells were powered up, a low voltage reading came from one of the alternating current units. The other two units spiked up to compensate for the lower voltage in the first unit.

The delay puts more pressure on Nasa to get Atlantis off the ground this week or postpone the launch until late October in order not to interfere with a Russian mission to the space station later in the month.

Construction job

Atlantis is on a mission to resume construction of the International Space Station, which was halted following the Columbia disaster in 2003.

ISS: ORBITING OUTPOST


The shuttle's six-strong crew will deliver and fit the P3/P4 truss, a 17-tonne segment of the space station's "backbone" that includes a huge set of solar arrays and a giant rotary joint to allow them to track the Sun.

The arrays will be the second of four sets, and will span 73m (240ft) when fully extended.

They will provide power for three science laboratories, two living chambers and other systems onboard the ISS. They effectively double the station's current ability to generate power from sunlight.

The half-built $100bn (£52bn) space station must be completed before 2010, when the shuttle fleet is due to be retired.

A failure to launch this week could delay the Atlantis mission until late October.




E-mail this to a friend
Related to this story:
Atlantis is locked down for storm (30 Aug 06 |  Science/Nature )
Lightning delays Atlantis launch (26 Aug 06 |  Science/Nature )
Countdown for astronaut's mission (23 Aug 06 |  Mid Wales )
Shuttle ready for August launch (17 Aug 06 |  Science/Nature )
Shuttle edges to night launches (20 Jul 06 |  Science/Nature )

RELATED INTERNET LINKS
Nasa
The BBC is not responsible for the content of external internet sites



SEARCH BBC NEWS: 

News Front Page | Africa | Americas | Asia-Pacific | Europe | Middle East | South Asia | UK | Business | Health | Science & Environment | Technology | Entertainment | Also in the news | Have Your Say |

NewsWatch | Notes | Contact us | About BBC News | Profiles | History

^ Back to top | BBC Sport Home | BBC Homepage | Contact us | Help | ©