A cruise ship the Saga Pearl II, previously called the Astoria, is being re-fitted in Swansea. Workers are replacing 200 tonnes of steel on the hull as part of the £20m operation.
Technical director Chris David talks through the process of re-fitting the ship.
Bookmark with:
What are these?
E-mail this to a friend