BBC NEWS Americas Africa Europe Middle East South Asia Asia Pacific Arabic Spanish Russian Chinese Welsh
BBCi CATEGORIES   TV   RADIO   COMMUNICATE   WHERE I LIVE   INDEX    SEARCH 

BBC NEWS
 You are in: UK: England
Front Page 
World 
UK 
England 
Northern Ireland 
Scotland 
Wales 
UK Politics 
Business 
Sci/Tech 
Health 
Education 
Entertainment 
Talking Point 
In Depth 
AudioVideo 


Commonwealth Games 2002

BBC Sport

BBC Weather

SERVICES 
Wednesday, 23 January, 2002, 12:23 GMT
Wind farm closed after blade snaps
Windfarm blade snaps in two
The blade sits at the top of a 93-metre-high column
A turbine propeller blade has folded in half at the UK's first electricity-generating offshore wind farm, at Blyth, in Northumberland.

It will not be known until data are gathered from a companion turbine whether high winds in the region are to blame for the breakdown.

The turbine operators, Amec Wind, hope to carry out an investigation with the unit's Danish makers, although bad weather has so far hampered plans for an inspection.

Small boats have been warned to stay away after a blade on one of the two 93-metre-high turbines snapped.

'Not pessimistic'

Dr Chris French, a lecturer in marine electrotechnology at Newcastle University, said it could be a long and tricky job to fix the blade.

Dr French told BBC News Online: "Before there is any attempt to take anything off, they will want to look at some of the data that come back from the instrumented turbine.

One of the two offshore wind turbines at Blyth
Small boats have been told to stay away
"I would also think a huge crane barge will be needed to come alongside to carry out the repair work.

"They are going to have to wait for a suitable gap in the weather before work can start.

"I cannot believe the turbines would have been installed without stress testing being carried out first, so I suspect a materials abnormality.

"These are the first offshore wind turbines of their type in the UK, if not the world, so we should not be too pessimistic about what has happened."

The turbines were opened in December 2000, just under a kilometre off Blyth, in a 4m operation by Hexham company Amec Wind.

The turbines were switched off when the fault was discovered, and an inspection by makers Vestas of Denmark is due on Wednesday.

An Amec spokesman said that although there had been windy weather no cause of the fault had yet been determined.

The turbines, opened by Energy Minister Helen Liddle, can generate enough power for 3,000 homes.


Click here to go to Tyne
See also:

18 Jan 02 | Northern Ireland
Coast wind farm plan
13 Dec 01 | Scotland
Giant wind farm for island
07 Dec 00 | Sci/Tech
Sea wind farm sets sail
Internet links:


The BBC is not responsible for the content of external internet sites

Links to more England stories are at the foot of the page.


E-mail this story to a friend

Links to more England stories