Europe South Asia Asia Pacific Americas Middle East Africa BBC Homepage World Service Education



Front Page

World

UK

UK Politics

Business

Sci/Tech

Health

Education

Sport

Entertainment

Talking Point

In Depth

On Air

Archive
Feedback
Low Graphics
Help

Tuesday, November 2, 1999 Published at 11:01 GMT


World: Americas

Flaw found in Boeing 767

No take-off for 34 new Boeing aeroplanes

Boeing has suspended delivery of four of its six models because a faulty cockpit part could burn too easily.

The loss of flight 990
And the aerospace giant will carry out changes to hundreds of planes already in service to correct a flaw in a cockpit shield that failed federal flame tests, said Jeff Hawk, director of aeroplane certification at Boeing's commercial division.

Thirty-four new 747, 757, 767 and 777 model planes will be delayed for "a few days" to ensure their drip shields, which keep moisture from seeping into the cockpit, are assembled according to the design approved by the US Federal Aviation Administration (FAA).

Unrelated to crash

"This is not related to any accident, incident or in-service event," Mr Hawk said.


[ image:  ]
The announcement was not related to the investigation into the cause of Sunday's crash of an EgyptAir Boeing 767-300ER passenger plane off the coast of Massachusetts, he said.

Although the faulty drip shield protected the cockpit from condensation it failed FAA flame tests, proving less resistant to fire than first thought.

"Condensation is going where it is supposed to go," Mr Hawk said.

"As assembled, the flammability characteristics are not as favourable as when the parts are properly assembled."

The drip shield is a hard, three-layer cap on the front of an aeroplane made of Kevlar or fibreglass and plastic. The version in service on the models in question was improperly bonded at Boeing's Spokane facility.

No immediate safety concerns

The drip shield flaw had not caused any problems on Boeing planes currently in service, he said.

"We do not see that there are any immediate safety issues with the drip shields currently in service."

Changes were being made to conform to FAA specifications.

Boeing has not yet estimated the cost of correcting the problem and declined to identify which customers will see their planes delayed.

The delays will not affect production and Boeing still expects to deliver a record 620 jets this year.



Advanced options | Search tips




Back to top | BBC News Home | BBC Homepage | ©




Africa | Americas | Asia-Pacific | Europe | Middle East | South Asia



Relevant Stories

02 Nov 99 | Americas
Grim wait for crash families

02 Nov 99 | Americas
Experts debunk flight rumours

31 Oct 99 | Americas
Safety officials 'dismayed ' with Boeing





Internet Links


Federal Aviation Administration

Boeing


The BBC is not responsible for the content of external internet sites.




In this section

From Business
Microsoft trial mediator appointed

Safety chief deplores crash speculation

From Entertainment
Taxman scoops a million

Violence greets Clinton visit

Bush outlines foreign policy

Boy held after US school shooting

Memorial for bonfire dead

Senate passes US budget

New constitution for Venezuela

North Korea expels US 'spy'

Hurricane Lenny abates

UN welcomes US paying dues

Chavez praises 'advanced' constitution

In pictures: Castro strikes out Chavez

WTO: arbitration in EU-Ecuador banana dispute

Colombian army chief says rebels defeated

Colombian president lambasts rebels